pembina logo

Tailings Management Plans (publication)

The total volume of fluid tailings ponds, a toxic byproduct of Alberta oilsands mining, reached 1.18 trillion litres in 2015. This is the result of 50 years of regulatory and engineering shortcomings.

Read More at The Pembina Institute